Reconcile the $55,880 approved model to the $50,175 planning BoM and finalize the order set
Execution Board
Every plan row as a card, grouped by status. Drag a card to a new column to change its status — the change is logged and undoable.
Not Started
65Obtain Lenovo ThinkCentre Neo 50q Gen 6 pricing, availability, and lead time
Place and confirm remaining critical CDW / hardware orders
Confirm DATA 111 / Room 5 specifics and rack units required by Rev
Confirm building access, occupancy readiness, alarm status, and work windows
Confirm cubes, offices, furniture, desk layout, and monitor quantities
Site readiness confirmed
Reply to Rev technical questions: handoff method, NTD, RJ45, contention, and RU
Fiber installed and RJ45 handoff verified
Confirm spare Meraki Z3C, active SIM, configuration, and handoff readiness
Provide Z3C serial number and add device to the Geismar site
Hand-carry Z3C from Columbus to Geismar
Install Z3C and perform onsite 4G / Day-1 connectivity qualification
Decide whether an external 4G antenna is required and install if approved
Meraki claimability and license mapping confirmed
Network configured in Columbus
Palletize and prepare configured gear for protected shipment
Internal shipment released
Ship configured gear from Columbus to Geismar
Install, rack, patch, and turn up the production network onsite
Validate LAN, Wi-Fi coverage, Internet, and 4G redundancy
Place rack / UPS / licensing / patch-cable order
Receive and inspect physical rack / UPS items
Floor-rack / UPS / Synology physical fit confirmed
Schedule electrician for dedicated 20A rack circuit
Install rack, UPS, shelves, patching, cable management, and 20A power
Rack, power, and UPS readiness accepted
Finalize cabling / electrical vendor quote, scope, insurance, access, and field plan
Cabling vendor scheduled for Aug 17 start
Confirm 48-run Cat6 plenum drop map, service loops, patch-cord lengths, and labels
Install 48 Cat6 plenum runs; test and label drops; complete display-power preparation
Cabling complete and accepted
Verify Louisiana privacy, audio-recording, and signage requirements
Finalize and order 8 x 5MP Axis cameras, Synology NVR, and surveillance drives
Receive and inspect camera / NVR hardware
Select and configure recorder, surveillance drives, retention, and motion settings
Confirm camera placement, mounting height, and final fields of view after racking
Install, aim, and connect cameras after cabling is ready
Cameras ready: recording, motion sensitivity, retention, and audio controls validated
Confirm Geismar user roster, start dates, and device quantities
New hires attend Columbus training
Image, issue, and complete user setup for new-hire laptops in Columbus
Confirm desk / monitor quantities and time direct shipment to site build-out
Receive office workstation bundles, monitors, docks, and peripherals
Stage and install office workstations and standardized peripherals
Order, receive, and configure the warehouse Lenovo desktop in Columbus
Install warehouse workstation and MS120-8FP PoE switch
Confirm redeployable printer inventory and service / toner transfer
Confirm 4x6 / 2x4 label requirements, DuraScan D860 details, and RF Smart devices
Order / transfer office Canon, warehouse laser, and two Zebra label printers
Receive printers, labels, supplies, scanners, and related devices
Stage, install, and configure office / warehouse printing and scanning devices
Printing, label, scanner, and RF Smart validation passed
Confirm display quantities, sizes, mounts, reused TV + cart, and shipping path
Mount TVs and install dashboard / display controllers
Configure and test Room Kit Mini, dashboards, HDMI, and consumer-TV network restrictions
Displays and collaboration room ready
Joe onsite for install support
Complete full onsite installation window
Integrated go-live validation passed
Resolve validation exceptions within the remediation buffer
Conduct readiness review and prepare approval package
Readiness signoff
Geismar site live
Define post-go-live support, hypercare, handoff, and project-closeout ownership
In Progress
7Correct CDW billing owner, bill-to / ship-to, payment terms, and correspondence
Run weekly project touchpoint, update plan, RAID, decisions, and evidence
Coordinate receiving coverage and delivery constraints for the gated site
Complete Rev splicing, cable pull, wall penetration, and install scheduling
Receive and inspect core network hardware in Columbus
Claim, license, configure on destination subnet, label, and bench test
Receive TVs, mounts, and dashboard display controllers
Blocked
0Empty
On Hold
3Return Z3C after stable production connectivity is established
Confirm cardkey vs. key entry and engage locksmith for access control
Plan and execute Phase 2 access-control implementation
Complete
6Consolidate the SharePoint / Planner system of record
Confirm IT budget and Finance / PO authority
Execute Rev Fiber order / contract for 500/500 service
Place eBay core network / Webex order 19-14968
Technically approve rack, UPS, licensing, shelves, and cable-management quote
Webex Room Kit Mini delivered
Cancelled
1Starlink / mobile-rack / roof-mount temporary connectivity plan